Shifting of cables: LV (0.415KV) + MV (11KV-33KV).
Cable Joints LV-MV.
Cable Laying as ADDC rules & specifications with using rollers and winch machine.
Recover and relay of 11 kv cables including trench excavation to remove & relay, relay cable & cables tiles, supply & lay warning tap & backfilling of existing & new tranche.
Trench excavation for laying cables.
Shifting & new supply & installations for HV Panels, TRM, QRM , PRY S/S , P. Unit , FP , ST , Switch Gear , street lights & foundations .
Laying For cables 132KV / 900mm S/C.
Reinstate cables 11KV/95mm – 300mm.
Provide & install Concrete cable covering tiles for LV cables size 50x20x5cm to protect cables.
Dismantle & relocate at any other/place, 1500KVA package, unit S/S with foundations, earthing & commissioning as per ADDC specification or return to ADDC store.
Installation of 11KV, 4 Feeder H.V panel including supply of an earthing material for external earthing of ring main substation connection to the panel as per ADDC/ADM specification.
Termination of 630mm2 copper XLPE/AL single core cable, copper XLPE/AL armored on substation & L.V distribution board in substation.
Pressure test & Megger test for QRM or Transformers or TRM & cables.
Electrical Drawing and designer for electrical loads & schedule single diagram & loads accounts as per UAE ADDC Rules. (ADWEA Member No: 1125/165-MORE 1500KW).
11KV -33KV Cable Joint with ADWEA Approve (L.No:0663).